The 50MWp Tarlac-1 solar power project has been exporting power to the Luzon grid since January 2016. It was among the solar power projects which were awarded eligibility to the 2nd wave of the Feed-in Tariff (FiT). The Tarlac-1 solar facility covers
55 hectares of industrial land within the PEZA- registered Central Technopark in Tarlac City. It is the first solar energy plant of PetroSolar Corporation, a joint-venture between PetroGreen Energy Corporation and EEI Power Corporation. Recently, PSC expanded the facility to add another 20MWp operating unit (Tarlac- 2), which was successfully put online in May, 2019.